Library
search
en
  • Englishdone
  • Deutsch
  • Español
  • Français
  • Hrvatski
  • Italiano
  • Nederlands
  • Norsk
  • Polski
  • Português
  • Russian
  • Slovensky
  • Srpski
  • Suomi
  • Svenska
  • 汉语
RelevancyPublication datearrow_drop_upPublication datearrow_drop_down
keyboard_arrow_right
keyboard_arrow_right
keyboard_arrow_right
Reference case study
cancel
English
cancel
Documents found: 45
PUBLIC
Northern European paint producer strengthens and secures operations with ABB Ability™ Advanced Digital Services
ID:2PAA119749
,
REV:A
English
Case study - Northern European paint producer strengthens and secures operations with ABB Ability™ Advanced Digital Services.
Reference case study
Reference case study
2019-09-24
PUBLIC
Multi-national gas supplier thwarts cyber attackers with ABB System 800xA v6 and ABB Security Update Service
ID:9AKK107366
,
REV:C
English
End-of-life issues and aging equipment left this major gas supplier vulnerable to cyber attack.
Reference case study
Reference case study
2018-10-11
PUBLIC
Successful migration to Freelance while nonstop producing
ID:3BDD017337
,
REV:-
English
Reference case study
Reference case study
2015-03-05
PUBLIC
Freelance warms up Szeged
ID:3BSE080651
,
REV:-
English
Reference case study
Reference case study
2014-08-29
PUBLIC
Case Study: Step change in boiler house control with Freelance
ID:3BDD017323
,
REV:-
English
Reference case study
Reference case study
2014-07-09
PUBLIC
Case study: Freelance in oil refining process
ID:3BSE077879
,
REV:-
English
Reference case study
Reference case study
2013-12-13
PUBLIC
Case study: Freelance used by China’s largest producer of soda ash
ID:3BSE077890
,
REV:-
English
Reference case study
Reference case study
2013-12-13
PUBLIC
Case study: Xuanhua Group looks to Freelance - then and now
ID:3BSE077880
,
REV:-
English
Reference case study
Reference case study
2013-12-13
PUBLIC
Case study: Shuangyushu Heating Power Plant upgrades Freelance over the years with Sentinel
ID:3BSE077634
,
REV:-
English
Reference case study
Reference case study
2013-11-25
PUBLIC
Freelance - A mine of benefits for Wake Stone
ID:3BSE076856
,
REV:-
English
Freelance
Reference case study
Reference case study
2013-10-25
PUBLIC
Modernization of mining ore plant in Ukraine
ID:3BSE072551
,
REV:-
English
Reference case study
Reference case study
2012-12-20
PUBLIC
Freelance - Glinojeck Sugar Plant Modernization
ID:3BSE070222
,
REV:-
English
Reference case study
Reference case study
2012-06-28
PUBLIC
Freelance plays role in think-tank's research into alternative energy sources
ID:3BDD017222
,
REV:-
English
Reference case study
Reference case study
2012-06-15
PUBLIC
Freelance breaks into glassmaking business with Ardagh Glass upgrade
ID:3BDD017223
,
REV:-
English
Reference case study
Reference case study
2012-06-15
PUBLIC
Never lose a drop of water with Freelance DCS
ID:3BSE068477
,
REV:-
English
Reference case study
Reference case study
2012-04-25
PUBLIC
Freelance and Petrohunt rejuvenate gas processing plant
ID:3BSE068417
,
REV:-
English
Reference case study
Reference case study
2012-03-27
PUBLIC
At full pressure for boilers with Freelance Control
ID:3BSE061497
,
REV:A
English
Reference case study
Reference case study
2012-02-27
PUBLIC
Freelance - VS Groups new flagship - Nobel NC
ID:3BSE064720
,
REV:A
English
Reference case study
Reference case study
2011-11-22
PUBLIC
Project Brief - Freelance 800F at BASF Fuel Cell, USA
ID:3BDD015215
,
REV:A
English
Production of the membrane electrode assembly with Freelance 800F.
Reference case study
Reference case study
2011-06-22
PUBLIC
Freelance Project Report - Cost efficient upgrade of SattCon to Freelance with AC 700F at Wasserversorgung Oberstdorf
ID:3BDD015274
,
REV:-
English
Reference case study
Reference case study
2011-01-25
PUBLIC
Success Story - "ABB Industrial IT Solutions installed at YunNan HongTa DianXi Cement", (Fieldbus application)
ID:3BDD013087R0001
,
REV:A
English
Reference case study
Reference case study
2009-10-12
PUBLIC
Success Story - "The new way for process operation in water treatment plant", (AC 800F and S800 I/O)
ID:3BDD011240D0101
,
REV:B
English
Reference case study
Reference case study
2009-10-12
PUBLIC
Project Reports AC 700F
ID:3BDD015200
,
REV:-
English
Reference case study
Reference case study
2009-05-25