Library
search
en
  • Englishdone
  • Deutsch
  • Español
  • Français
  • Hrvatski
  • Italiano
  • Nederlands
  • Norsk
  • Polski
  • Português
  • Russian
  • Slovensky
  • Srpski
  • Suomi
  • Svenska
  • 汉语
RelevancyPublication datearrow_drop_upPublication datearrow_drop_down
keyboard_arrow_rightkeyboard_arrow_right
Reference case study
cancel
Documents found: 40
PUBLIC
ABB solar inverter transforms Sicilian sunshine into clean energy
ID:9AKK107492A7618
,
REV:B
English
Reference case study
Reference case study
2019-09-02
PUBLIC
ABB solar inverter transforms Sicilian sunshine into clean energy
ID:9AKK107492A7562
,
REV:A
Italian
Reference case study
Reference case study
2019-08-29
PUBLIC
Case Study - ABB helps build a brighter future for Costa Rica
ID:9AKK107492A5296
,
REV:A
English
ABB has delivered a unique solar solution enabling Costa Rica’s largest solar park to provide a clean and independent power supply to 10 percent of the country’s population.
Reference case study
Reference case study
2019-06-26
PUBLIC
REACT 2 - Case note
ID:9AKK107492A0718
,
REV:A
Italian
Reference case study
Reference case study
2019-02-14
PUBLIC
Revitalizing farming in drought-hit rural areas
ID:9AKK107046A4171
,
REV:A
English
Reference case study
Reference case study
2018-06-26
PUBLIC
Solar inverter case study - Going green in the Chilean desert
ID:9AKK107045A5558
,
REV:B
English
Reference case study
Reference case study
2018-03-08
PUBLIC
World’s most powerful rail frequency converter
ID:1 KHA001511
,
REV:A
English
Record-breaking system helps boost energy supply to German rail network
Reference case study
Reference case study
2018-01-25
PUBLIC
World’s most powerful rail frequency converter
ID:1KHA001511
,
REV:-
English
Record-breaking system helps boost energy supply to German rail network
Reference case study
Reference case study
2015-07-13
PUBLIC
EssPro Energy Storage case study: Cowessess First Nation Wind and Storage project in Saskatchewan, Canada
ID:9AKK10103A2231
,
REV:-
English
Cowessess First Nation was one of the first communities in Canada to install a wind turbine with a battery energy storage system to support it, lowering energy bills while integrating renewable power that reduces greenhouse gas emissions.
Reference case study
Reference case study
2015-06-22
PUBLIC
VArPro STATCOM case study: Solar PV Cluster in Massachusetts, Voltage regulation through reactive power support
ID:9AKK10103A2230
,
REV:-
English
Multiple solar installations in Massachusetts required reactive power support to manage a growing population of PV sites in the region. ABB provided a STATCOM solution to meet all interconnection requirements.
Reference case study
Reference case study
2015-06-17
PUBLIC
STATCOM case study: Musselwhite gold mine, voltage support solution for expansion project
ID:PESTATCOM-PHFC02U-EN
,
REV:-
English
A significant mine expansion meant increased power requirements for a large facility in Canada. A study determined that a STATCOM hybrid solution would manage facility power quality resulting in high operational reliability as well as power factor compliance.
Reference case study
Reference case study
2015-05-04
PUBLIC
STATCOM case study: Young-Davidson gold mine, A power quality solution for full site reliability
ID:PESTATCOM-PHFC01U-EN
,
REV:-
English
Mining operations require large amounts of clean electric power to produce valuable minerals reliably and efficiently without disrupting the grid. ABB’s STATCOM solution was chosen to maintain voltage stability and a high power factor to meet heavy process power needs.
Reference case study
Reference case study
2015-05-04
PUBLIC
STATCOM case study: Punta Lima wind farm, dynamic VAr compensation for grid code compliance A
ID:PESTATCOM-PHFC03U-EN
,
REV:-
English
A wind farm in Puerto Rico, challenged to comply with strict interconnection requirements, chose ABB to deliver reactive power compensation, voltage ride through, frequency response and ramp rate support.
Reference case study
Reference case study
2015-02-02
PUBLIC
ABB generators and converters help AREVA wind turbines optimize energy yield at alpha ventus
ID:3BHS801057
,
REV:-
English
Reference case study
Reference case study
2014-11-07
PUBLIC
100 MVA Power Converter for Variable Speed Pumped Hydropower
ID:9AKK105713A9083
,
REV:A
English
Reference case study
Reference case study
2014-10-06
PUBLIC
VArPro™ STATCOM zapewnia zgodność z warunkami przyłączenia farmy wiatrowej do sieci
ID:2864PL1162-W1-pl
,
REV:-
Polish
Reference case study
Reference case study
2014-10-01
PUBLIC
ÖBB, Frequenzumrichter Timelkam, Österreich
ID:3BHS355311D01
,
REV:A
German
Reference case study
Reference case study
2014-09-09
PUBLIC
ÖBB, Frequency Converter at Timelkam, Austria
ID:3BHS355311E01
,
REV:A
English
Reference case study
Reference case study
2014-09-09
PUBLIC
System magazynowania energii EssPro™ PCS umożliwia wdrożenie czystej energii na indonezyjskiej wyspie Kai Besar
ID:2864PL1151-W1-pl
,
REV:-
Polish
Reference case study
Reference case study
2014-09-08
PUBLIC
System magazynowania energii EssPro™ PCS w laboratorium generacji rozproszonej Politechniki Łódzkiej
ID:2864PL1150-W1-pl
,
REV:-
Polish
Reference case study
Reference case study
2014-09-08
PUBLIC
ABB’s EssPro™ Energy Storage Power Conversion System (PCS) contributes to cost savings and environmental sustainability
ID:2864PL747-W1-en
,
REV:A
English
Reference case study
Reference case study
2014-08-04
PUBLIC
ABB’s EssPro™ Energy Storage Power Conversion System (PCS) facilitates a research project at the Lodz University of Technology in Poland
ID:4116PL743-W1-en
,
REV:E
English
Reference case study
Reference case study
2014-05-20
PUBLIC
Battery energy storage PCS solution for EKZ, one of Switzerland’s largest energy companies
ID:PEBESS-PHFC03U-EN
,
REV:-
English
Reference case study
Reference case study
2014-01-08
PUBLIC
Raccordement électrique des navires à quai "clés en main" à la gare maritime de Stena Line B.V. à Hoek van Holland (Pays-Bas)
ID:1TXH000193L0301
,
REV:A
French
Reference case study
Reference case study
2012-12-19
PUBLIC
Case study ferries - Stena Hoek van Holland
ID:9AKK105408A9471
,
REV:-
English
Reference case study
Reference case study
2012-06-26
PUBLIC
PCS100 SFC Congo oil and gas industry tunes into efficient frequency conversion
ID:2UCD301122
,
REV:A
English
Reference case study
Reference case study
2011-12-09
PUBLIC
New York Power Authority Garden City, Long Island, USA
ID:PEBESS-PHFC02U
,
REV:A
English
Reference case study
Reference case study
2011-07-18
PUBLIC
World’s Largest Battery Energy Storage System Fairbanks, Alaska, USA
ID:PEBESS-PHFC01U
,
REV:A
English
Reference case study
Reference case study
2011-07-18
PUBLIC
PCS100 SFC shore power connection
ID:2UCD501126
,
REV:C
English
Reference case study
Reference case study
2010-04-22
PUBLIC
INCO, Grid intertie Converter with extended STATCOM functionality
ID:3BHS220999
,
PART:E01
,
REV:-
English
Reference case study
Reference case study
2010-02-08
PUBLIC
BKW FMB Energie AG, Railway Converter Station, Wimmis, Switzerland
ID:3BHS 216 518 ZAB E01
,
REV:-
English
Reference case study
Reference case study
2006-05-15
PUBLIC
BKW FMB Energie AG, statische Bahnstromumrichteranlage, Wimmis, Schweiz
ID:3BHS 216 518 ZAB D01
,
REV:-
German
Reference case study
Reference case study
2006-05-15
PUBLIC
DB Energie GmbH, Railway Converter Station, Limburg, Germany
ID:3BHS 136 062 ZAB E01
,
REV:-
English
Reference case study
Reference case study
2003-08-29
PUBLIC
DB Energie GmbH, Railway Converter Station, Limburg, Germany
ID:3BHS 146 593 ZAB E01
,
REV:-
English
Reference case study
Reference case study
2003-08-29
PUBLIC
DB Energie GmbH, Railway Converter Station, Duesseldorf, Germany
ID:3BHS 136 063 ZAB E01
,
REV:-
English
Reference case study
Reference case study
2003-08-29
PUBLIC
DB Energie GmbH, Umrichterwerk, Duesseldorf, Deutschland
ID:3BHS 136 063 ZAB D01
,
REV:-
German
Reference case study
Reference case study
2003-08-29
PUBLIC
DB Energie GmbH, Umrichterwerk, Limburg, Deutschland
ID:3BHS 136 062 ZAB D01
,
REV:-
German
Reference case study
Reference case study
2003-08-29
PUBLIC
DB Energie GmbH, Railway Converter Station, Wolkramshausen, Germany
ID:3BHS 136 061 ZAB E01
,
REV:-
English
Reference case study
Reference case study
2003-08-29
PUBLIC
DB Energie GmbH, Umrichterwerk, Wolkramshausen, Deutschland
ID:3BHS 136 061 ZAB D01
,
REV:-
German
Reference case study
Reference case study
2003-08-29
PUBLIC
DB Energie GmbH, Umrichterwerk, Limburg, Deutschland
ID:3BHS 146 593 ZAB D01
,
REV:-
German
Reference case study
Reference case study
2003-08-29