PUBLIC
ABB to deliver power quality solutions for High Speed 1
ID:9AKK105152A9161
,PART:-
,REV:-
English
ABB has secured a major
project with High Speed 1
to design, manufacture and
install capacitive compensation
solutions to prevent voltage
drops along the 25kV catenary
supply serving the 68 mile (109
km) High Speed 1 route from
the Central London terminal at
St Pancras International to the
Channel Tunnel at Dover.